If you’re planning to remodel your home but you’re curious about how long it will take, you will want to keep reading. Timelines are important considerations, as they influence everything from budget to daily disruption of your family. It’s important to understand realistic timelines in order to come up with a plan and budget – all while minimizing disruption to your daily life.
Check out this breakdown of typical renovation projects in Boston, from quick upgrades to full-scale overhauls.
Minor Renovations: 2–4 Weeks
Simple updates that are generally cosmetic and require minimal coordination can be completed within two to four weeks. These projects include fresh paint, new fixtures, or light flooring.
Kitchen Renovations: 6–12 Weeks (Construction Phase)
From demolition and plumbing to cabinetry and finish work, kitchen remodels are on the complex end of a home update. You can expect them to last between six and 12 weeks. Keep in mind that design, permitting, and material lead times can stretch the project out six to nine months.
Bathroom Remodels: 4–8 Weeks (Construction Phase)
A standard bathroom renovation takes four to eight weeks, including demolition, plumbing, tile, and fixture installation. Add extra time for moving walls or ordering custom materials.
Basement Finishes & Interior Updates: 2–4 Months
Converting a basement into livable space takes between two and four months because it involves many trades, such as framing, HVAC, electrical, and drywall.
Room Additions: 3–6 Months
Adding rooms such as family room extensions or extra bedrooms can take between three and six months due to foundation work, framing, utilities, and finish components.
Whole-Home Renovations: 6–12+ Months
Comprehensive home overhauls that involve multiple rooms or systems usually take six to 12 months,plus planning and permitting time.
Factors That Can Delay Your Project
From permits to material availability, there are many factors that can delay your renovation, adding to the timeline and completion date.
- Planning and Design: This is the phase where layouts, finishes, and schedules are finalized, and can take between one and three months depending on project scope and complexity.
- Permitting: Permits are required for structural, plumbing, or electrical work, which can add weeks or even months before construction can begin.
- Material Lead Times: Specialty items such as custom cabinets or imported fixtures can delay the project by several weeks.
- Scheduling and Coordination: Coordinating multiple trades, from plumbers to electricians, can delay project completion.
How to Plan Ahead Successfully
Here are some quick tips on how you can plan ahead for a successful Boston renovation.
- Start early. Begin planning at least three to six months before your target completion.
- Build in cushion time. Expect delays and make room in the budget for them.
- Prioritize permitting. Get permissions in place before work starts.
- Order long-lead materials early to avoid delays later.
- Communicate frequently. A reliable contractor in Boston will keep your project on track.
Setting realistic timelines will help you manage expectations and enjoy a smoother renovation journey, whether you’re planning a modest update or a full transformation.